Don't miss what's happening in Pearland
People on Pearland.com are the first to know.
Go to top of page
Close
 
Close
Back
* CONTEST TODAY: 24 Hours Only - Win a $25 Gift Card to Buffalo Wild Wings!  Ends in 8 hrs Read more »

Local Topic Wastewater Spill Quickly Contained By City

Local Topic Wastewater Spill Quickly Contained By City

« Back
This discussion has been locked.
Message Menu
by: PearlandDotCom Active Indicator LED Icon 8 Site Admin  OP 
~ 4 years ago   Mar 8, '20 10:48pm  
 
Loading Image...
 
The Texas Commission on Environmental Quality (TCEQ) regulations (30 TAC 319) require that municipalities report wastewater collection system overflows to the local media and local officials when overflows exceed 100,000 gallons.
 
On Sunday, March 8, 2020 at 8:30 a.m. the City of Pearland discovered that a domestic wastewater spill from the Barry Rose Water Reclamation Facility (Permit # WQ0010134002) collection system occurred due to experiencing critical equipment failure. The estimated time of the overflow occurred between 4 a.m. and 8:30 a.m.
 
The plant has a bar screen which removes debris and rags from wastewater as it enters the plant. The screen became obstructed with debris and alarms failed to notify City staff, which caused wastewater to not be able to properly flow into the plant. An estimated 150,000 gallons (6% of daily intake) of domestic wastewater overflowed onto the facility grounds, which lead to a drainage ditch that outflows to Clear Creek near Barry Rose and Pearland Parkway. The spill was immediately contained once discovered and the equipment failure corrected. As well, staff has made corrective measures to prevent a recurrence.
 
The impacted area is Clear Creek south of Barry Rose; any contaminants should dissipate quickly.
 
City staff is monitoring the situation and testing water upstream and downstream and reporting results to TCEQ. In addition, any wastewater at the Barry Rose facility grounds has been neutralized, removed, and returned to the treatment plant.
 
Due to the length of time the overflow occurred, City of Pearland recommends citizens avoid any contact with the creek, as well as abstain from any recreational use of the channel from downstream of the Barry Rose Water Reclamation Facility until Tuesday, March 10th. If the public comes into contact with water or soil potentially affected by the spill, they should bathe and wash clothes thoroughly as soon as possible.
 
For questions or concerns contact Public Works at 281.652.1900.
 
www.pearlandtx.gov
* Reactions disabled on political threads.
What are your thoughts? Log in or sign up to comment
Replies:
Message Menu
Stealth83 Active Indicator LED Icon 7
~ 4 years ago   Mar 9, '20 6:11am  
Removed By Request
* Reactions disabled on political threads.
Message Menu
squidgirl Active Indicator LED Icon 6
~ 4 years ago   Mar 9, '20 7:57am  
Clear Creek wasn't so clear anymore. Beware of floaters.
* Reactions disabled on political threads.
Message Menu
Inb0913 Active Indicator LED Icon 6
~ 4 years ago   Mar 9, '20 8:12am  
@PearlandDotCom: Thanks for sharing. Glad it was contained fast
* Reactions disabled on political threads.
Message Menu
Knk Active Indicator LED Icon 4
~ 4 years ago   Mar 9, '20 10:30am  
@PearlandDotCom : Thanks for letting us know.
* Reactions disabled on political threads.
This discussion has been locked.
« Back to Main Page
Views: 2,910
# Replies: 4

Accurate Plumbing Services




Anytime Pest Elimination  Logo Exit Realty 360 Logo Kosmin Media Group  Logo Scotty's Steakhouse Scotch & Prime Logo Accurate Plumbing Services  Logo Emet's Plumbing Logo Handal's Roofing Logo One Source Web Development Logo Kosmin Media Group / Pearland.com Advertising & Marketing Logo Foundation MD Logo Scotty's Saloon Logo Pearland School of Music Logo
Sponsor an ad Sponsor an Ad »